Perimeter fencing for the new Health Sciences Building is now being installed, and Parking Lot F is closed. Learn more about construction projects on campus at the link below.
More Information
Perimeter fencing for the new Health Sciences Building is now being installed, and Parking Lot F is closed. Learn more about construction projects on campus at the link below.
The library has the first three graphic novels in the recent Black Panther series and we have just ordered the fourth. If you liked the movie and want to learn more of the back story, borrow these today! You'll find them on our new bookshelf.
[caption id="attachment_4037" align="alignright" width="194"] Black Panther: A Nation Under Our Feet, Book 2[/caption]
[caption id="attachment_4036" align="alignleft" width="190"]
Black Panther: A Nation Under Our Feet, Book 1[/caption]
[caption id="attachment_4038" align="aligncenter" width="192"]
Black Panther: A Nation Under Our Feet, Book 3[/caption]